Week 3 300 Stitch KAL

August 17, 2010

This week we’ll be only doing 3 swatches for a total of 6 points since last week we had 8 points. Here’s the plan:

Swatch 15 Knit and Purl Diagonals: cast on 20 stitches and work for 20 rows. Note: this with require working 2 charts and a half rather than just a complete number of charts.

Swatch 16 Lozenges stitch: cast on 20 and work for 20 rows. Here you will also do 2.5 repeats of the chart. It looks best if you do 2 stitches of the chart, the two full repeats and then 2 stitches of the chart to break your half into two one-quarter sections of the chart.

Swatch 17 Squares within squares: cast onĀ 36 and work in pattern for 48 rows. Due to size, this should be your most time consuming swatch this week.

Get ready for next week as it’ll be a bigger challenge. We’ll be working stitches 18-20 and they’ll all be rather large swatches due to the large pattern repeats. I’m getting so excited. We’re almost half way through the first chapter. I’m really eager to get to some harder patterns, cables, and lace.